Quotation

Quotation

Quotation Details Closing Date

PEVENTIVE MAINTENANCE PROGRAM FOR ELECTROCHLORINATION PROGRAM FOR 6 MONTHLY-BAMBANGAN (UD4000X1 UNIT-AGE 70 WATER TREATMENT SYSTEM

JANS(RNU):9/2026/1(S)

KERJA-KERJA MEMBEKAL DAN MEMASANG DUA(2) UNIT PAM AIR MENTAH 45KW DI LOJI RAWATAN AIR TONGOD

JANS-TGD-9/2026/3(S)

PEMBAIKAN PAM TWP NO.1 DAN NO.2 110KW DAN CONTROL PANEL LRA PINANGAH

JANS-TGD:9/2026/2(S)

KERJA BAIKPULIH PAM PENGGALAK NO.1 DI STESEN PAM KG NOMUKON, TONGOD

JANS-TGD:9/2026/1(S)

SUPPLY AND INSTALL DOSING PUMP AT LRA KIMOLOHING AND LRA BAMBANGAN (RECALL NO.1)

JANS(RNU): 8/2026/2(S)

PENGGANTIAN PAM AIR MENTAH DI LOJI RAWATAN AIR BOTITION, BELURAN

JANS/BLN/ 2026/06(S)

KERJA-KERJA MEMBEKAL DAN MEMASANG PUMP PIPELINE VALVE DI LOJI RAWATAN AIR BAHAGIAN KINABATANGAN

JANS/KBN/ 2026/03(S)

KERJA-KERJA PENGGANTIAN SISTEM DOSING PUMP DI LOJI RAWATAN AIR BATU PUTIH, KINABATANGAN

JANS/KBN/ 2026/02(S)

CBM METER REPLACEMENT WORK AND IMPLEMENTATION OF HYDRAULIC SYSTEM FOR DISTRIC KINABATANGAN

JANS/KBN/ 2026/01(S)

PENYAMBUNGAN PAIP 100MM DI JALAN KEBUN SAFIMA, BELURAN

JANS/BLN/ 2026/03(F)