PEVENTIVE MAINTENANCE PROGRAM FOR ELECTROCHLORINATION PROGRAM FOR 6 MONTHLY-BAMBANGAN (UD4000X1 UNIT-AGE 70 WATER TREATMENT SYSTEM
JANS(RNU):9/2026/1(S)
|
|
KERJA-KERJA MEMBEKAL DAN MEMASANG DUA(2) UNIT PAM AIR MENTAH 45KW DI LOJI RAWATAN AIR TONGOD
JANS-TGD-9/2026/3(S)
|
|
PEMBAIKAN PAM TWP NO.1 DAN NO.2 110KW DAN CONTROL PANEL LRA PINANGAH
JANS-TGD:9/2026/2(S)
|
|
KERJA BAIKPULIH PAM PENGGALAK NO.1 DI STESEN PAM KG NOMUKON, TONGOD
JANS-TGD:9/2026/1(S)
|
|
SUPPLY AND INSTALL DOSING PUMP AT LRA KIMOLOHING AND LRA BAMBANGAN (RECALL NO.1)
JANS(RNU): 8/2026/2(S)
|
|
PENGGANTIAN PAM AIR MENTAH DI LOJI RAWATAN AIR BOTITION, BELURAN
JANS/BLN/ 2026/06(S)
|
|
KERJA-KERJA MEMBEKAL DAN MEMASANG PUMP PIPELINE VALVE DI LOJI RAWATAN AIR BAHAGIAN KINABATANGAN
JANS/KBN/ 2026/03(S)
|
|
KERJA-KERJA PENGGANTIAN SISTEM DOSING PUMP DI LOJI RAWATAN AIR BATU PUTIH, KINABATANGAN
JANS/KBN/ 2026/02(S)
|
|
CBM METER REPLACEMENT WORK AND IMPLEMENTATION OF HYDRAULIC SYSTEM FOR DISTRIC KINABATANGAN
JANS/KBN/ 2026/01(S)
|
|
PENYAMBUNGAN PAIP 100MM DI JALAN KEBUN SAFIMA, BELURAN
JANS/BLN/ 2026/03(F)
|
|