Quotation

Quotation

Quotation Details Closing Date

KERJA-KERJA PENGGANTIAN PASIR FILTER DI LOJI RAWATAN AIR TONDULU 1 & 2 TAMBUNAN

JANS/TBN/2026/09/03(S)

KERJA-KERJA PEMBAIKAN & MODIFIKASI PAIP 100MM JENIS MSCL DI JALAN TAMBALANG-PENDAMAI, TUARAN

JAS/TRN/2026/09/33(S)

REPAIR AND MAINTENANCE WORKS FOR PUMP AND MOTOR 200KW NO.2 AT TELIPOK BOOSTER PUMP HOUSE, TUARAN. (RECALL NO. 1)

JAS/TRN/2026/09/29(S)

KERJA-KERJA MEMBEKAL DAN MEMASANG PAM PENGGALAK BARU DI RUMAH PAM MENAWO, DAERAH KENINGAU

JA/KGU/2026/09/6(S)

KERJA-KERJA PENGGANTIAN PAIP 150MM DIA. MSCL SECARA EXPOSED DI JALAN PANTAI DEKAT MASJID RAUDHAH,LAHAD DATU (RECALL NO.2)

JAS/LD:15/2026

KERJA-KERJA PENGGANTIAN PAIP 150MM MSCL DI KAMPUNG BATU 5 JALAN SEGAMA LAMA, LAHAD DATU (RECALL NO.2)

JAS/LD:14/2026

SUPPLY AND INSTALLATION OF POWER MONITORING SYSTEM AT BOOSTER PUMP DAERAH RANAU (RECALL NO.2)

JANS(RNU):9/2026/5(S)

PREVENTIVE MAINTENANCE PROGRAM FOR ELECTROCHLORINATION PROGRAM FOR 6 MONTHLY - KUNDASANG (UD3000X2 UNIT-AGE 4) WATER TREATMENT SYSTEM (RECALL NO.2)

JANS(RNU):9/2026/2(S)

PREVENTIVE MAINTENANCE PROGRAM FOR ELECTROCHLORINATION PROGRAM FOR 6 MONTHLY - BAMBANGAN (UD4000X1 UNIT-AGE 7) WATER TREATMENT SYSTEM (RECALL NO.2)

JANS(RNU):9/2026/1(S)

PEMBAIKAN PAM TWP NO.1 DAN NO.2 11OKW DAN CONTROL PANEL LRA PINANGAH (RECALL NO.2)

JANS-TGD:9/2026/2(S)