Archived Tender and Quotation

Archived Tender and Quotation

No. Maklumat Tender Tarikh Tutup
211.

KERJA-KERJA PENCEGAHAN DAN PENYELENGGARAAN PEMBAIKAN PAM AIR TERAWAT DAN PAM AIR MENTAH SELAMA SATU TAHUN DI LOJI RAWATAN AIR SILABUKAN, LAHAD DATU (RECALL NO.2)

JANS/LD: 09/2025
212.

PEMBELIAN SATU UNIT MULTISTAGE PUMP DI BOOSTER PUMP STATION KG.SILAM, LAHAD DATU (RECALL NO.2)

JANS/LD:08/2025
213.

KERJA-KERJA MEMBEKAL DAN MEMASANG PAM AIR MENTAH TUNGGU SEDIA DI HOLDING TANK LRA KEMABONG, TENOM

JANS-TNM/07/2025/05(S)
214.

KERJA-KERJA NENBEKAL DAN MENGHANTAR PAM PENGGALAK DAN SISTEM VFD (VARIABLE FREQUENCY DRIVES) BAGI PAM PENGGALAK DI RUMAH PAM KALLANG, TENOM

JANS-TNM/07/2025/04(S)
215.

BAIKPULIH PAM PENGGALAK NO.1 DAN NO.2 DI STESEN PAM SAMPOR KOTA MARUDU.

JANS/KMU/SH2025/08
216.

KERJA-KERJA PENGGANTIAN METER BERSAIZ 15MM & 25MM DIAMETER YANG BERUMUR 7 TAHUN KE ATAS DI DAERAH KOTA MARUDU.

JANS/KMU/SH2025/07
217.

KERJA PENYENGGARAAN RUTIN 3 UNIT JANAKUASA BERKAPASITI 250KVA DAN 2 UNIT JANAKUASA BERKAPASITI 50KVA DI LRA PAGALUNGAN, NABAWAN. (RECALL NO. 1)

JANS/NAB/2025/07/2 (S)
218.

PREVENTIVE MAINTENANCE PROGRAM FOR ELECTRO CHLORINATION SYSTEM FOR 6 MONTHLY- KUNDASANG (UD3000 X 2 UNITS-AGE 3 ) & RANAU (UD4000T X 1 UNITS-AGE 6 WATER TREATMENT SYSTEM

JANS-RNU:7/2025/2
219.

KERJA-KERJA MEMBEKAL DAN MEMASANG PAM AIR MENTAH TUNGGU SEDIA DI HOLDING TANK LRA KEMABONG, TENOM

JANS-TNM/07/2025/05(S)
220.

KERJA-KERJA NENBEKAL DAN MENGHANTAR PAM PENGGALAK DAN SISTEM VFD (VARIABLE FREQUENCY DRIVES) BAGI PAM PENGGALAK DI RUMAH PAM KALLANG, TENOM

JANS-TNM/07/2025/04(S)
221.

KERJA-KERJA MEMBEKAL PAM PENGGALAK DAN PANEL KAWALAN JENIS VFD/VLT UNTUK RUMAH PAM SIGAPON 1 DAN 2, TENOM

JANS-TNM/07/2025/03(S)
222.

KERJA-KERJA MEMBEKAL DAN MEMASANG PAM AIR TERAWAT DI LRA SENAGANG 1

JANS-TNM/07/2025/02(S)
223.

KERJA-KERJA MEMBEKAL DAN MEMASANG PAM AIR MENTAH DI LRA SENAGANG, TENOM

JANS-TNM/07/2025/01(S)
224.

SUPPLY AND REPLACEMENT WORKS OF NEW SAND MEDIA AND FILTER NOZZLES AT TOPOKON II WTP, TUARAN.

JAS/TRN/2025/07/13(S)
225.

KERJA PENYELENGGARAAN RUTIN 3 UNIT JANAKUASA BERKAPASITI 250KVA DAN 2 UNIT JANAKUASA BERKAPASITI 50KVA DI LRA PAGALUNGAN, NABAWAN.

JANS/NAB/2025/07/1 (S)