Quotation

Quotation

Quotation Details Closing Date

KERJA-KERJA PENYELENGGARAAN, PENGIREKKAN DAN PEMBERSIHAN KAWASAN MUKASAUK LOJI RAWATAN AIR KUNDASANG AKIBAT RIBUT/BANJIR DAN KEMARAU UNTUK TEMPOH ENAM(6) BULAN (RECALL NO.2)

JANS(RNU):7 2024/1

PROJEK PENGGANTIAN PAIP USANG MSCL 150MM DI KAMPUNG MURUT BT 1. KALABAKAN. (RECALL NO.1)

JANS/TWU/SH/2024/28/S)

KERJA-KERJA PENGGANTIAN METER UZUR, ROSAK DAN YANG BERUSIA 7 TAHUN KE ATAS DI DAERAH TAMBUNAN

JANS/TBN/2024/08/10(S)

PENGGANTIAN PERALATAN SISTEM KLORIN DI LRA PAITAN, BELURAN (RECALL NO.1)

JANS/BLN/2024/06(S)

PENGGANTIAN PERALATAN SISTEM KLORIN DI LRA BOTITION, BELURAN

JANS/BLN/2024/05(S)