KERJA BAIKPULIH PAM PENGGALAK NO.1 DI STESEN PAM KG NOMUKON, TONGOD
JANS-TGD:9/2026/1(S)
|
|
SUPPLY AND INSTALL DOSING PUMP AT LRA KIMOLOHING AND LRA BAMBANGAN (RECALL NO.1)
JANS(RNU): 8/2026/2(S)
|
|
PENGGANTIAN PAM AIR MENTAH DI LOJI RAWATAN AIR BOTITION, BELURAN
JANS/BLN/ 2026/06(S)
|
|
KERJA-KERJA PENGGANTIAN PAIP JENIS MSCL BERSAIZ 100MM DI KAMPUNG ENTABUAN PADANG, TENOM
JAS/TNM/09/2026/01(S)
|
|
KERJA-KERJA MENAIKTARAF PAM PENGGALAK DI RUMAH PAM PENGGALAK SINSAN
JANS/KDT/2026/8/8
|
|
PENGGANTIAN PAM AIR TERAWAT DI LOJI RAWATAN AIR BOTITION, BELURAN
JANS/BLN/ 2026/05(S)
|
|
KERJA-KERJA MEMBEKAL DAN MEMASANG PUMP PIPELINE VALVE DI LOJI RAWATAN AIR BAHAGIAN KINABATANGAN
JANS/KBN/ 2026/03(S)
|
|
KERJA-KERJA PENGGANTIAN SISTEM DOSING PUMP DI LOJI RAWATAN AIR BATU PUTIH, KINABATANGAN
JANS/KBN/ 2026/02(S)
|
|
CBM METER REPLACEMENT WORK AND IMPLEMENTATION OF HYDRAULIC SYSTEM FOR DISTRIC KINABATANGAN
JANS/KBN/ 2026/01(S)
|
|
PENYAMBUNGAN PAIP 100MM DI JALAN KEBUN SAFIMA, BELURAN
JANS/BLN/ 2026/03(F)
|
|