-A A +A

      


Calendar of Events

November 2020

Mo Tu We Th Fr Sa Su
26
27
28
29
30
31
1
 
 
 
 
 
 
 
2
3
4
5
6
7
8
 
 
 
 
 
 
 
9
10
11
12
13
14
15
 
 
 
 
 
 
 
16
17
18
19
20
21
22
 
 
 
 
 
 
 
23
24
25
26
27
28
29
 
 
 
 
 
 
 
30
1
2
3
4
5
6
 
 
 
 
 
 
 
    • Today
    • JANS event
    • Public Holiday
  • EMERGENCY NOTICE OF WATER SUPPLY DISRUPTION AT MEROTAI

    Date : 27 November 2020 (Friday). Disruption period : until works is complete. Purpose : Temporary reduction in treated water production at Merotai II Water Treatment Plant due to repair burst flow pipe inside the chamber. For further enquiries, please contact Careline at 088-326888 (24 Hour) and 016-8948685 (PKAD - En. Jusafri Idris)

  • EMERGENCY NOTICE OF WATER SUPPLY DISRUPTION AT KALABAKAN

    Date : 27 November 2020 (Friday). Disruption period : 8:00 a.m until works is complete. Purpose : Temporary shutdown of Kalabakan Water Traetment Plant due to pump hose damage. For further enquiries, please contact Careline at 088-326888 (24 Hour) Or 016-8948685 (PKAD- En. Jusafri Idris) or 014-9508067 (PKAD - En. Hairum Hassan)

  • EMERGENCY NOTICE OF WATER SUPPLY DISRUPTION AT TAWAU

    Date : 26 November 2020 (Thursday). Disruption period : Until turbidity NTU back to normal. Purpose : Temporary reduction in treated water production at Jalan Utara Water Traetment Plant due to high level of turbidity NTU. For further enquiries, please contact Careline at 088-326888 (24 Hour) Or 016-8948685 (PKAD- En. Jusafri Idris) or 014-9508067 (PKAD - En. Hairum Hassan)

  • EMERGENCY NOTICE OF WATER SUPPLY DISRUPTION AT TENOM

    Date : 26 November 2020 (Thursday). Disruption period :1:30 p.m. until repair work is completed Work : To repair the burst pipe measuring 6 inch UPVC to tank perumahan Kallang, Tenom. For further enquiries, please contact Careline at 088-326888 (24 Hour) Or 019-5367322 (En. Andrew Intang) 013-6370379 (En. Ayufkhan Nobotkhan)

  • SIJIL SIRIM ISO/IEC27001.2013 (JANS TELIBONG II)
  • SIJIL SIRIM ISO/IEC27001.2013 (JANS KK)
  • SIJIL SIRIM ISO/IEC27001.2013 (JANS ICT)
  • Sijil Penyertaan 'Information Security Management System (ISMS) Certification Scheme'
  • Pertandingan Laman Web Terbaik Negeri Sabah

How safe is Babagon Dam against large storms?

The spillway of the Babagon Dam has been designed to discharge the probable maximum flood inflow (PMF) of 2560 cubic meters per second.  Such a flood has a probability of the order of 1 in 10,000 years.  The spill tail canal can safely discharge a 1 in 1000 years flood which is 810 cubic metres per second.  Even the PMF will not endanger the dam although it may overflow the banks of the spill way canal.